Showing posts with label renovation. Show all posts
Showing posts with label renovation. Show all posts

Friday, April 27, 2012

House Renovation: Vendors Details (Part II)

I'm on EL this whole week because my car broke down on Tuesday morning and husband is not around to help me bring it to the workshop. So I'm sort of on 'house-arrest', seeing that I have no transport to move around. Trust me, it's not fun staying at home with nothing much to do. I was bored to death.

Okay, let's just skip that part. It's not that important anyway.

Hey, I know I promised you a second post on details of my vendors. So here you go. I guess it's all complete now. It's now time to decorate our new pod and that means, cash is rolling into the drain and I'm really broke (eventho it was just payday yesterday!) Please, please, please I'm in need of a relief donation. Huhu!

Lamps

As you know, budget is our main priority. Since we have a major renovation, that means everything needs to be replaced and the same goes to the lightings. I decided to forego the original lampu kalimantang and spent a few bucks on new soft light lamps. We browsed through Mudah and found cheaper solution for it. We bought ours at wholesale price and mind you, they are really, really cheap and the owner does give some good pointers and suggestions on the lightings. The shop has quite a few choices to your liking (as shown in pictures). Just drop by to Silver Star Wholesale Lighting Enterprise, located on the top floor in The 19 USJ Digital Mall. You can contact the owner at 014-2272368 for directions.

Furniture
Most of my furniture are from Macy. I bought them while they were on sale at the end of last year and thus it was a bargain. They're not entirely cheap nor expensive, but I was hooked on some of their design and decided to buy them eventho we weren't sure of renovating the house at that time. And I'm just glad I bought them much earlier because apparently they're no longer re-produce certain designs that we have. Phewwwwwww! My black sofa is from Macy Seri Kembangan while my bedframe and dining table set are from Macy IOI Mall. I think it's best to buy from them when they're having their major sale. Super cheap and choices are a plenty, I tell you!

Grill
We got the contact from family, where apparently most of my husband's relatives used their service whenever they want to have new grills for the house. After getting some ridiculous quotations from other vendors, we decided to hire them because they have the cheapest and most affordable rates in town. We managed to get by with only 3k to do grills the whole house, including the main gate. Isn't it cheap? You can contact Ahlim Engineering at 012-3091087 for quotation and discussion.

Astro / Streamyx Relocation
It was a headache at first when we want to find someone to move our readily installed Astro and Streamyx to the new address. So I went online and found a contact who can relocate my Astro. My husband decided to dismantle the dish by himself to save cost so we just hire a wireman to re-install our Astro at the new house. The charge is RM100 for installing the dish and RM150 for dismantling and installing the dish from your old place to your new house. You can contact Mizan at 019-2832487. As for Streamyx relocation, I just went to TM Point office in USJ Taipan (since I stayed in Subang previously) and filled up a form to apply for relocation. Within 7 working days, their assigned vendor will contact you to install the new line and you'll be charged RM30 for the service. As usual, they can be quite a slowmo at times so it's best to keep contacting them if they failed to do so after the promised period.

Hmmmm, I think that's all the details and contacts that I have so far. I can't think of anymore right now. Do let me know if I missed on anything. Will surely keep you informed and updated then. :)

Thursday, April 19, 2012

House Renovation: Vendors Details (Part I)

I know you guys have been waiting for this post, right? I promised to share with you the details of my vendors once the house if completed and Alhamdulillah, the house is finally ready within 5 weeks. Now, I am happy to share these info with you for your future reference. Any price given to us by the vendors is based on mutual agreement and understanding. Please contact the vendors themselves for further discussion regarding price and quotation yeah.

Contractors
We didn't hire those professional contractors. Since we're working on a tight budget, we decided to just hire a group of freelance Indonesian workers. We have seen their previous works and were satisfied with the outcome, thus agreed to hire them to do the house after seeing that they have the most appropriate rates around. The total cost for our renovation is 38k including raw materials, paint job and some simple wiring. But be sure to prepare a written contract for both parties before you hire them. That's their requirement. Do contact Shukri at 016-2865089 for further discussion.

Kitchen Cabinet
Since we have a rather cute kitchen area, a simple and clean cabinet is my top priority. We finally stumbled upon Wira Kitchen and hired them to do the kitchen cabinet. They have several branches and we ordered our cabinets from their outlet in Puchong. Located in Puchong Jaya, right opposite IOI Mall, just above Berry's Bakery. Of course, they have several designs to choose from and what I like about Wira Kitchen is that, they'll print out an outplan of your desired kitchen with the potential price even if you just pop by to ask for quotation. The size of our kitchen cabinet is roughly around 5 1/2 ft, priced at 3k including kitchen sink, drying rack, knobs and installation. Do contact Kelvin at 010-22066780 for further discussion.

Stove
We decided to not have the built-in stove for our kitchen cabinet because it just adds up to the cost. What we did was we source for a separate stove to match our cabinet. Luckily, we found a Zanussi stove in a perfect white color to go with the white kitchen cabinet at a very affordable price. The stove comes with an electric oven (yeay, now I can start baking!) and is priced at RM1599 plus free delivery. Bought this at Ideal Electrical in Shah Alam. Do contact them at 03-55482122 for directions.

Tiles
We didn't have much time to look around for the cheapest supplier in town so we just dropped by to the nearest outlet possible, located at Jalan Puchong. Merely 3 minutes by car from our house. Hahaha. We bought a heapful of tiles for the kitchen area, bathroom/toilet and porch area. They have a selection of choice according to your budget. Please contact LS Marble & Tiles at 03-80753199 for directions.

Arm Chairs
I've received feedback and questions from readers (ceh, macam la ramai sangat yang baca blog aku ni!) regarding my two purple arm chairs. I bought them on December last year, while we're still in the midst of planning for the house. I just thought, hey why don't we buy these first while we have the cash. They were purchased at House of Khatulistiwa at Avenue@Puchong Furniture Mall, located further up from Puchong Utama. Priced at 1.7k for both chairs, including free delivery. You can change the fabric, they have several choice of colors. Please contact Faysal at 013-4121394 for more information.

I shall write more about my other vendors for lightings, bathroom accessories and furniture in the next post. For the time being, just bear with these yeah. Time for blogging is very restricted now since I've started working. :( Any questions, just give me a hello and I will try to reply you as soon as possible. Cheerios!

Friday, April 13, 2012

House Renovation: Week Five (The Final Week!)

The renovation is finally done and over. Since I'm back at work now (sigh!), we could only visit and clean the house on weekends. We still have a month rental lease at our old flat, so for the time being we're going back and forth from USJ to Puchong on weekly basis to manage the new house. It's kinda sad too thinking that we just have two weeks left to stay here at the flat before we move out for good to our new home sweet home. After staying here for almost two years, for sure we have a lot of memories to cherish.

But of course, we have to move on. We're going to start a family soon with a baby coming in, and I need my very own place to call home. Alhamdulillah... It took five weeks for this major renovation to be completed. I guess this is just the right time for us to move in, before I deliver my baby in July.

Here's the compilation of pictures to feast your eyes. I will write in details about my vendors (I know a lot of you have been asking these questions), most probably next week because I'm kinda occupied with packing, cleaning and house moving right now. Urghhhhhhh I just wish I can have extra leave from work to manage this new house. Tak cukup lagi ke kau dah cuti 2 bulan selama ni cik Elly ooiiiiiiiii! Kahkahkah!

Oh, mind the messiness of my house in the pictures. We're in the midst of cleaning at that time and I was too lazy to wait until everything is spotless and clean to do some photography skills. That can wait. Maybe in another post. So just stay tuned!


Let's start with the front of the house. Everything is just simple from the gate to the grill and the wood awning. Anything that suits our budget is good. Hahaha. Interior wall is painted already. Somehow it looks a bit yellowish where initially I wish it looks more to brownish but it's okay, we can always repaint it later. Maybe after 3 years. Kehkehkeh! (kes bajet dah habis la ni...). The tiles need to be cleaned with acid so we'll leave the job to the workers. I can't smell chemicals. It's not good for me and the baby.

Let's move on further into the porch area. We're not going to park our cars inside here. They should be outside. Hahaha! We have two separate area tho. The first one (first picture) is supposed to be the parking area but we're going to leave it wide open as it is. It's fully shaded so kids can play here. In the second picture, we built a stage with 2-step stairs which leads to the main entrance. We also installed two identical hanging outdoor lamps in those areas.

Now, we're entering the living hall. I'm gonna separate it into two, one for formal and one for tv area. It's still empty because we haven't transferred our existing furniture from the flat yet. What we have now is just the new furniture bought on sale last year. That explains why we don't have curtains, carpet, wall decorations, etc yet. Those will have to wait by end of this month.

The dining hall, nothing much too. We haven't mounted the wall deco for this area. And we're still waiting for our cabinet and large mirror from Macy to complete this area. Oh, maybe some table mats and a vase of fresh flowers would do to transform the bare table. That can wait too, by end of this month. Hahaha!

The master bedroom (first picture), just have some basic furniture. Bed frame and wardrobe in dark colored wood. I was too lazy to hang the curtains since I'm too heavy now. I need help for that. The third room (second picture) is still bare. We planned to transform this area into prayer/guest/utility room, some basic furniture are still at our old flat. That too, have to wait. No pictures of the second room tho. That's the baby nursery and it's still cluttered with baby items. I just have no mood to take pictures after the camera went dead.

The first picture is our bathroom. Yes, we're just gonna leave it like that. We're still procrastinating on finishing the walls with gloss paint. The second picture is the toilet area. We have all the accessories in stainless steel to match the theme: GREY


Hahaha at this time the kitchen area is cluttered with all sorts of cleaning bottles so mind the messiness. Nothing much to add for this area. Except for the fridge and microwave oven which will be transported later together with the other furniture from our flat.

Oh yes, the clutters from the previous works are still there. We need more manpower to move those things away. Once everything is removed, then we can start cleaning this area. Yes, the metal door is finally there. Thank God!

We are so broke (I mean really reallyyyyyyyyyyyy broke!) this month so any plan for interior decoration has to be postponed to next month. We received offers from family members regarding housewarming gifts. Hahaha this is good but we have most of the major things settled. Hmmmm I guess we have to start working on the gift list anyway, I can't refuse such good offers. Inilah rezeki namanya. Alhamdulillah!

Friday, April 6, 2012

House Renovation: Week Four

It's April already and by now, I can safely say that the house is currently 80% ready. All that's lacking now are just the back grill and front gate, some paint job touch-ups, floor polishing plus some mopping to be done and installing curtain railings, bathroom/toilet accessories and electrical items, ie; wall lights and fans.

The furniture that we ordered earlier arrived just in time, though there were a little mishaps here and there during delivery but everything went well in the end. Here are some pictures taken during the day of my visit: 
The master bedroom in super bright color. Hahaha! They installed the window glass and painted the wood frame already.

The front (outer) view of the house with the new glass window. Tiles are done and the wood awning is completed. Tinggal nak cat dinding je.

The inside view of the living hall with lights on and lights off. The door has finally arrived! Yeayyyy! The wall for this area is painted in grey. The main area of the living hall is completed with a simple cornice. 

The dining hall. Table set just arrived (we bought them at Macy at a discounted price!) and we decided to unwrap the plastic cover once the construction works are done and over. Otherwise the chairs will be all dusty.

My current favorite area. The kitchen, all in white. Dah rupe showroom lak gamaknye.

Alhamdulillah everything went well just as how we planned and wanted it to be. Eventho we have to strapped in some cash and sacrifice certain things for this major renovation, the look of contentment after seeing everything we've been dreaming of came true right in front of our eyes is amazing! With the baby coming, I'm sure this is double happiness for us to start a family. I thanked Allah for this bountiful sustenance. Alhamdulillah!

Wednesday, March 28, 2012

House Renovation: Week Three

The third week of our construction work is progressing well. Most of the indoor renovation is almost settled. They just need to clear up the debris, clean the floor and do some touch-ups for the wall and such. For now, they're currently working on the porch and putting new glass for the front windows.

We spent so much this week. As I said, we have foreseen the hidden costs prior to this renovation works. This week alone, we spent bucks to buy tiles for porch and the kitchen wall. We also purchased new lamps, fan and stove to be installed for the new house. But that doesn't include payments for grill, bathroom/toilet utensils and other small items. Dizzy!

Here's a summary of pictures of the current progress for this week:

The mess at the front of the house. They're currently working on the steps, cement and later, will put on new floor tiles and glass for windows. Oh, new coat of paint as well.

The painting job for dining hall and master bedroom is done! All they need to do now is just clean up the floor and install new lamps.

The modern kampung concept for the bathroom and toilet is almost completed. They need to repair the pipes and whatnots before we can coat the walls with gloss paint and install some bathroom accessories. 

The back of the house is spacious. For the time being, this will be our laundry/drying area. Still waiting for the metal door to arrive and need to so some cleaning job and touch-up for the paint as well.

They still have another two weeks to meet our deadline. So far, everything is on track. Hopefully by next week, we can see newly installed grill, kitchen cabinet and the porch area in complete form.

Thursday, March 22, 2012

House Renovation: Week Two

Syukur Alhamdulillah! I cannot be more than thankful now, seeing the progress of our major construction. The workers are a wonder, they're quick! I went to the site for a straight 2 days and every other day, there must have been something new everytime we drop by.

I will share my contractors info and details once the house is completed. And whether they are recommended or not, based on my personal point of view and experience. For the time being, let's just do with the current updates on the house.

The major works for our living hall. Previously, the entrance is through sliding doors. We took them off, installed new 3-panel windows and set up a new 1-door entrance at the side.

The outside/front look of the house. The day we went, they already built the wall and window holes. The next day, they removed the old zinc awning and started to work on the wood awning. Yeay!

The bathroom and separate toilet. Once they installed the new toilet bowl and sink, we just realized that we still have ample space left for the bathroom. Aaaagggggg! We need to change the doors and coat the walls with gloss finish. Dizzy!

The new window for the third room at the back of the house.

The new black tiles have been installed, together with the new window. They just need to do another paint job and install new wall tiles, then the cabinet people will come and set up the new kitchen cabinet.

We received mixed reviews on the chosen wall colors from people who have visited the house. I admit the colors are too strong and yes, sometimes they do look like a splash of kindergarten colors. Haha but I kept ground and won't change the colors because I believe in my choice, no matter how fugly they are. 

This is really a major construction. We know we have some minor and hidden costs prior to this construction. This includes new fans, lighting, furniture, bathroom appliances and the list goes on. I'm in dire need of donation! For the time being, baby preparation is currently on hold. Oh, sedihnyeeeeeee!

Friday, March 16, 2012

House Renovation: Week One

We are so grateful to finally have a place to call home. Plus, it's a land house, the one we've been dreaming of since we planned to start a family. And no no, we didn't buy a brand new house either. With our salary, even combined is still won't allowed us to own a house. You do know how expensive it is to buy a real estate now. *sighs*

The house that we have is actually an old one, a single storey and kinda spacious, belongs to my FMIL. It's more than 20 years old, even my husband used to stay there for a few years when he was a kid, so you can imagine how in dire state it's currently in. For the time being, we'll be continue paying the lease/rental at family's price. Thank God as it helps a lot! But someday, in 5 years time maybe (when we're in a really really stable financial condition), we're going to buy the house from my FMIL and change it to our name. *prays hard*

Looking for a contractor to start the construction work on the house was a headache. We have shortlisted a few candidates after looking into the budget and time frame. Mind you, we have a very limited finance to construct an old house to a comfortable place to live in, so budget constraint is number one problem. We finally resorted to these freelance Indonesian workers after seeing their works and how our budget suits their fees.

Since these workers are working on their own, we have made a very strict and clear instructions and what to do's and don'ts. We gave them a month to settle the interior construction and another couple of week to settle the exterior works. And we do make a compulsory visits on the site about 2-3 times a week to check on the progress. Alhamdulillah, so far everything is going well and works the way we want them to be, only faster. I'm so happy on seeing the progress.

The living hall. We installed a simple plaster ceiling and it was done a day after we requested for it. Super fast!

The dining hall with high ceiling and sun-roof windows.

The master bedroom, still in the midst of painting. Color in aqua blue.

The second bedroom, with high ceiling and sun-roof windows. The baby nursery will be in here. Room is painted in salmon pink.

The third room. It's in mint green. Just in case the baby is a boy, then the nursery will be in here. Haha!

The kitchen. Waiting for them to install new tiles then kitchen cabinet will follow suit. 

The bathroom in gloss cement. We're planning to put a seated toilet bowl. Hoping the outcome to be just as what we have imagined.

The toilet. We're going to put a seated toilet to replace the old one. 

The back area. It's really spacious outside. Because of budget restrictions, we have to postpone our initial plan to expand the kitchen and can only do with just building a concrete wall, put on cement floor and set up a simple awning. This will be our washing/drying area.

I guess that's all the updates on the house for the first week. Can't wait to see the second week progress. We can only hope that the construction works can be done earlier than we expected. Now back to the packing process in our old flat. I just realized we have a lot of unnecessary things at home. It's time to do some wardrobe cleaning and charity, yo!

  © Blogger Template by Emporium Digital 2008

Back to TOP